Building the Konig Wolf

Heavy Arms Version

Heavy Arms Konig Wolf consists of: 

2 x Cap Sprues

1 x 4 Connector Rod Sprue

4 x Rubber Belts

1 x Parts Bag (Eye pieces, Pilot, and Gear)

1 x Motor

2 x Body Halves

18 x Parts Sprues (Total)

1 x Sticker Sheet

1 x Instruction Manual

1 x DVD (with HAKW version)

1 x Zoid Visa application see here. (with HAKW version)

Note: There are more sprues in the HAKW version than in the regular kit due to the addition of the CP units.

The build starts with the body.

Then moves onto the tail.

We then move to the head, which is a complex piece.

When complete it looks awesome.

The legs are next. The build starts with the front pair and then moves onto the rear.

The treads are then assembled  and placed on each side.

The legs are then ready to be affixed and the HA Wolf can stand.

The exhaust unit is next.

Completed.

It's onto the night vision scope. Which, as a nice detail, includes a translucent orange piece for the three eye pieces.

With the eye piece in place it can be positioned over the head.

The completed standard wolf.

Time to start the CP units.

The CP 22 is then fitted.

The unit is then ready for stickers. Let me take a minute to say that I enjoy trimming stickers, and every Zoid in my collection is has the stickers placed exactly as they appear on the box. It really pisses me off when the kit does not contain the stickers the box shows as is the case with the HAKW version of the kit. This unit took over two hours to trim and sticker, and I had to dig through the extra sticker box I have in order to make the unit appear exactly as it does one the box. That being said below is the finished unit.

This has been a Zoid.US production. No image may be used without permission. � 2007 -WIKD